Le guide pratique
← Onboard templates

Onboard templates / v1

Gas and low-flashpoint fuel bunkering

Procédure disponible en anglais

IGF Code; approved fuel procedures. Before each low-flashpoint fuel transfer. Responsible: Chief engineer and bunker supervisor.

IGF Code; approved fuel procedures

Chief engineer and bunker supervisor · Before each low-flashpoint fuel transfer

Stop on leak, gas alarm, ESD fault or loss of exclusion-zone controls.

01

Vessel and procedure

Vessel name and registry / IMO identifier, if applicable
Flag, vessel type, gross tonnage, use and voyage area
Actual event time, ship-local UTC offset and recorder
Approved procedure, version and applicable criteria
Responsible person / role
02

Before you begin

Check applicable fuel code, vessel approval and trained personnel.

Review bunker compatibility, capacity and transfer plan.

Verify detection, ventilation and hazardous-area controls.

03

What to record

Check linked ESD, communications and emergency response.

Review purging, connection and disconnection under approved procedure.

Record actual limits, tests, transfer completion and faults.

04

Follow-up and review

Finding, immediate response, action owner and due date
Verification evidence, reviewer and next review trigger
Responsible person acknowledgement

Original operational starters, checked against the linked sources on 13 November 2026. Adapt with a competent maritime reviewer. They do not certify compliance or replace approved manuals, statutory surveys or accepted record books.