Value the quantity without a supported use before its recorded cutoff separately from food actually discarded. Keep lot cost, dated demand and disposal evidence together. An exposure estimate is neither an observed loss nor proof that purchasing caused it.

At a glance
Value the quantity without a supported use before its recorded cutoff separately from food actually discarded. Keep lot cost, dated demand and disposal evidence together. An exposure estimate is neither an observed loss nor proof that purchasing caused it.
Define the stock and the cost basis
Choose one site, an as-of time and a base unit. Record each ingredient's lot reference, physical quantity, release status, original date information and supported unit cost. Keep packaging and cooked output outside this raw-ingredient example. Check the usable window through the site's authorised process; a price calculation cannot establish food suitability or extend a safety date. The operational cutoffs below are fictional scenario inputs, not a shelf-life rule or a legal interpretation of date labels. Tax is excluded and all prices are hypothetical monetary units.
Build the opening record before estimating exposure
At fictional snapshot S0, 23 November at 18:00, LOT-A contains 12 kg at 3 per kg: 12 × 3 = 36. LOT-B contains 8 kg at 4 per kg: 8 × 4 = 32. Physical stock is 20 kg and recorded ingredient cost is 68. Assume both lots have completed the site's relevant checks at this point, with no intervening movements. Keep the actual label and supporting decision available. In the example, A's operational cutoff is 24 November at 18:00 and B's is 25 November at 18:00.
Compare each lot with a dated use plan
The documented plan allocates 10 kg of A before its cutoff and 6 kg of B before its later cutoff. A therefore has 12 − 10 = 2 kg unallocated, costing 2 × 3 = 6. B has 8 − 6 = 2 kg unallocated, costing 2 × 4 = 8. Across the two lots, 16 kg is planned and 4 kg, costing 14, lacks a supported use within the recorded windows. This is exposure under the stated plan. It does not prove that 4 kg will be wasted or that 14 can be saved. Review demand changes without counting the same service requirement against both lots.
Replace an estimate with the actual disposition record
At fictional S1, 24 November at 19:00, evidence records 10 kg of A consumed and the remaining 2 kg discarded under event DISP-A-01, with expiry recorded as the immediate reason. A's consumed ingredient cost is 30 and discarded ingredient cost is 6; its remaining quantity is zero. B has no movements and remains 8 kg at cost 32, with 6 kg still planned and 2 kg, costing 8, unallocated. The opening 68 reconciles as 30 consumed + 6 discarded + 32 remaining. Do not add the earlier exposure of 14 to the recorded disposal cost of 6. Labour, disposal fees, refunds, revenue and total business loss are outside this calculation and remain unknown.
Investigate the purchasing decision without inventing a cause
An expiry reason identifies the recorded immediate event; it does not prove overordering, a supplier failure or poor staff performance. Retrieve the original order, actual delivered usable life, pack minimum, demand assumption and any cancelled service or hold. Assign an owner and document the evidence for the proposed change. Compare the next eligible order with actual usable stock and confirmed needs. Do not resolve a cost question by extending dates, inventing consumption or assuming an automatic supplier credit. The FLW Standard distinguishes cost elements and immediate causes from underlying drivers; this worksheet is an original operational record, not a conformity claim.
Use one snapshot and test the downloaded record
The localized CSV contains S0 and S1 for both lots plus a genuinely blank row. It stores values and does not recalculate or send orders. Within one snapshot, current quantity equals opening quantity minus cumulative consumption and disposal; current ingredient cost equals that quantity times the lot's unit cost. Recompute unallocated quantity and its cost after editing the plan. Select one as-of snapshot rather than adding both stages. Unknown other costs stay blank. A blank actual record is not evidence of zero waste. Verify your physical count, dates, units and event references before using the figures for a decision.
Test what Kivloo actually records
Kivloo's current procurement model excludes quarantined and past-expiry lots from eligible consumption. A manually recorded waste movement reduces the selected lot and records its ingredient cost; a forecast simulation is a different, prospective result. Neither establishes that disposal happened or validates a product's safe life. Test actual lot and event retrieval in your configuration. Setup requires the web and online access; document scans and invoice workflows are currently web-only and require human review. Internal approval does not dispatch a supplier order, and the beta does not promise automatic waste prevention, credit recovery or profit improvement.
Stock near expiry: price the exposure, record the loss
Fictional S0: raw ingredients, tax excluded; no disposal recorded
| Physical stock kg | Stock ingredient cost | Planned use kg | Unallocated kg | Exposure cost | Recorded disposal cost |
|---|---|---|---|---|---|
| 20 | 68 | 16 | 4 | 14 | 0 |
- Physical stock kg
- 20
- Stock ingredient cost
- 68
- Planned use kg
- 16
- Unallocated kg
- 4
- Exposure cost
- 14
- Recorded disposal cost
- 0
Your dated record
Download the expiry-cost review CSVA few useful answers
Is the 14 an actual loss?
No. At S0 it values 4 kg without a supported use in the stated plan. The later fictional disposal record contains 2 kg of A at ingredient cost 6; B's remaining exposure is a separate unresolved amount.
Can I add the two CSV snapshots?
No. They describe the same lots at different times. Select one state and use the movement references to reconcile it; adding both would count stock twice.
Sources and further reading
- BCcampus · Basic Inventory Procedures · English
- FLW Standard · Appendix D5 / Chapter 11 · English
- Kivloo · Procurement beta · English
Explore starter templates
Start with a useful checklist
English