Praxiswissen
← Onboard templates

Onboard templates / v1

Watertight integrity and stability readiness

Ablauf auf Englisch verfügbar

SOLAS II-1; Load Lines. Before sailing and condition change. Responsible: Master and chief officer.

SOLAS II-1; Load Lines

Master and chief officer · Before sailing and condition change

Stop operations when stability or watertight integrity cannot be demonstrated.

01

Vessel and procedure

Vessel name and registry / IMO identifier, if applicable
Flag, vessel type, gross tonnage, use and voyage area
Actual event time, ship-local UTC offset and recorder
Approved procedure, version and applicable criteria
Responsible person / role
02

Before you begin

Check approved stability information and loading instrument status.

Review draughts, freeboard and load line conditions.

Inspect watertight doors, hatch covers and closing appliances.

03

What to record

Review bilge alarms, pumps and flooding response.

Confirm authorised loading condition and damage-control information.

Record defects and competent review; this form performs no stability calculation.

04

Follow-up and review

Finding, immediate response, action owner and due date
Verification evidence, reviewer and next review trigger
Responsible person acknowledgement

Original operational starters, checked against the linked sources on 13 November 2026. Adapt with a competent maritime reviewer. They do not certify compliance or replace approved manuals, statutory surveys or accepted record books.