Praxiswissen
← Onboard templates

Onboard templates / v1

Energy isolation and electrical work permit

Ablauf auf Englisch verfügbar

Approved SMS; MLC A4.3. Before maintenance and isolation changes. Responsible: Chief engineer and authorised isolator.

Approved SMS; MLC A4.3

Chief engineer and authorised isolator · Before maintenance and isolation changes

Do not work until hazardous energy is isolated, verified and controlled.

01

Vessel and procedure

Vessel name and registry / IMO identifier, if applicable
Flag, vessel type, gross tonnage, use and voyage area
Actual event time, ship-local UTC offset and recorder
Approved procedure, version and applicable criteria
Responsible person / role
02

Before you begin

Identify electrical, hydraulic, pneumatic, thermal and stored energy.

Record isolation points and lock or tag custody.

Verify dead or zero-energy state by a competent person.

03

What to record

Check adjacent live systems and PPE.

Record individual authorisations and shift handovers.

Account for people and tools before authorised reinstatement.

04

Follow-up and review

Finding, immediate response, action owner and due date
Verification evidence, reviewer and next review trigger
Responsible person acknowledgement

Original operational starters, checked against the linked sources on 13 November 2026. Adapt with a competent maritime reviewer. They do not certify compliance or replace approved manuals, statutory surveys or accepted record books.