SOLAS II-1. At planned test and drill intervals. Responsible: Chief engineer.
SOLAS II-1
Chief engineer · At planned test and drill intervals
Do not test in a way that removes essential safety services without controls.
01
Vessel and procedure
Vessel name and registry / IMO identifier, if applicable
Flag, vessel type, gross tonnage, use and voyage area
Actual event time, ship-local UTC offset and recorder
Approved procedure, version and applicable criteria
Responsible person / role
02
Before you begin
01
Review emergency loads and approved test procedure.
02
Check generator starting and fuel readiness.
03
Verify batteries, switchboards and emergency lighting.
03
What to record
04
Record approved load and transition test results.
05
Review blackout recovery and communications.
06
Record defects, operational restrictions and verified restoration.
04
Follow-up and review
Finding, immediate response, action owner and due date
Verification evidence, reviewer and next review trigger
Responsible person acknowledgement
Original operational starters, checked against the linked sources on 13 November 2026. Adapt with a competent maritime reviewer. They do not certify compliance or replace approved manuals, statutory surveys or accepted record books.