# Energy isolation and electrical work permit

Approved SMS; MLC A4.3. Before maintenance and isolation changes. Responsible: Chief engineer and authorised isolator.

2026-11-13 · v1 · en

## Before you begin

Responsible: Chief engineer and authorised isolator. Confirm Approved SMS; MLC A4.3, flag implementation, vessel applicability and the controlled procedure before starting. Do not work until hazardous energy is isolated, verified and controlled.

Start with the flag, vessel type, gross tonnage, commercial use, persons carried and voyage area. Confirm the applicable rules and approved procedure before using a starter. Language does not determine jurisdiction.

## Responsibility and timing

Chief engineer and authorised isolator. Before maintenance and isolation changes.

## Stop and escalate

Do not work until hazardous energy is isolated, verified and controlled.

## Procedure

1. Confirm scope and brief the team using the controlled vessel procedure.

2. Complete the checks below in sequence, record actual evidence, and apply the stop conditions immediately.

3. Record deviations, interim controls, notification, action owner and due date.

4. Obtain competent verification and authorised restoration before closing the record.

## What to record

1. Identify electrical, hydraulic, pneumatic, thermal and stored energy.

2. Record isolation points and lock or tag custody.

3. Verify dead or zero-energy state by a competent person.

4. Check adjacent live systems and PPE.

5. Record individual authorisations and shift handovers.

6. Account for people and tools before authorised reinstatement.

## Follow-up and review

Do not work until hazardous energy is isolated, verified and controlled. Record the restriction, notify the responsible person, assign an owner and due date, and verify the evidence before authorised resumption.

## Official starting points

- [IMO · Treaty and amendment status](https://www.imo.org/en/about/conventions/pages/statusofconventions.aspx)

- [ILO · MLC consolidated text including 2022 amendments](https://www.ilo.org/resource/other/maritime-labour-convention-2006-amended-including-2022-amendments)

- [ILO · MLC text and amendment status](https://www.ilo.org/global/standards/maritime-labour-convention/text/lang--en/index.htm)

- [IMO · ISM Code](https://www.imo.org/en/ourwork/humanelement/pages/ismcode.aspx)

Original operational starters, checked against the linked sources on 13 November 2026. Adapt with a competent maritime reviewer. They do not certify compliance or replace approved manuals, statutory surveys or accepted record books.